Dennis Corporation
   

Construction Management


Sidewalk Construction Project

PRE-CONSTRUCTION PHASE

  • Staff will monitor schedule and budgets during design;
  • Provide value engineering and life cycle cost analysis;
  • Review permit requirements;
  • Site Evaluations; and
  • Preliminary Cost Estimates

DESIGN PHASE

  • Will assist in A/E selection;
  • Provide design review;
  • Provide public relations; and
  • Cash flow forecasting

BID AND AWARD PHASE

  • Will pre-qualify bidders;
  • Advertise for bids;
  • Provide bid analysis; and
  • Draft contract documents

CONSTRUCTION PHASE

  • Will attend construction conferences;
  • Develop material schedules,
  • Provide progress payments;
  • Provide construction administration;
  • Perform testing and inspection; and
  • Maintain records

POST-CONSTRUCTION PHASE

  • Will provide a certificate of occupancy and as-builts
 

Dennis Corporation, as a construction manager, acts and participates as the owner's representative throughout the project to ensure the owner’s particular needs are achieved. Our track record for delivering projects on schedule and within budget is a credit to our experienced staff that coordinates between architectural, engineering and construction teams with quick resolutions to issues. As the owner’s representative, our team of professionals will ensure each specific project's expectations are met. Our goal and track record prove that we are successful at achieving these results.


Pipe Inspection Camera


Bank Progress Inspection Project


Road Widening Project

If you would like to discuss a construction management project, please contact:
Frank Hribar, Construction Manager
1800 Huger Street
Columbia, SC 29201
Office 803-227-8580
Mobile 803-600-4510
Email fhribar@denniscorporation.com

 
copyright